Our projects in the years 1994-2020

We participated in the commissioning process of

  • boiler in EL Połaniec,
  • boiler at EC Szczecin,
  • PEC Wyszków boiler,
  • MPEC "TERMAL" -Lubań boiler,
  • EC Starachowice boiler,
  • dust boiler in El Pątnów,
  • biomass boiler in BRW Biłgoraj,
  • boiler at EC Łódź-Zgierz,
  • boiler at EC Kielce,
  • boiler in Petrochemia Płock,
  • dust boiler at EC Warszawa-Siekierki,
  • a dust boiler at EC III Łódź,
  • a fluidized bed boiler at EC Warszawa Żerań,
  • a fluidized bed boiler at ZF "Polpharma" in Starogard Gdański,
  • a unit with a biomass boiler at EC Elbląg,
  • units 4 and 5 in EL Turów,
  • gas and steam unit at CHP Rzeszów,
  • gas and steam unit at CHP Lublin Wrotków,
  • unit in "ELCHO" Chorzów,
  • 910 MW unit in Jaworzno,
  • operation of a water boiler (gas burner) with a thermal power of 38 MW, produced by SEFAKO in FENICE Tychy,
  • Modernization of the Combined Heat and Power Plant in the Malbork Sugar Plant.

We participated in the installation of

  • flue gas desulphurization installation in Enea Wytwarzanie in Kozienice,
  • desulphurization installation at EL. Belchatow,
  • desulphurization installation at EC Łódź,
  • LOBBE waste disposal in Dąbrowa Górnicza,
  • carburizing system at EC 2 Łódź,
  • flue gas desulphurization installation in EL Siersza,
  • installation of coal sludge in the Jaworzno power plant,
  • flue gas desulphurization installation at the Jaworzno II Power Plant,
  • dry flue gas desulphurization installation at EL Turów,
  • Dolna Odra Power Plant / adaptation of FGD 7.8 to the requirements of the BAT Conclusions regarding the reduction of SO2 emissions,
  • operation of a water boiler (gas burner) with a thermal power of 38 MW, produced by SEFAKO in FENICE Tychy,
  • Commissioning of the wet flue gas desulphurization installation at Energa's Ostrołęka B Power Plant.

Independently implemented investments

  • Provision of the services of the Commissioning Manager at the commissioning of the gas boiler room at FCA Tychy,
  • Provision of the services of the Commissioning Manager of a 55MW steam turbine set at ZW Kraków,
  • Commissioning and maintenance of cooling water pumping stations and commissioning and maintenance of electrical switchboards on the task "Construction of a power unit at EC" Zofiówka "in Jastrzębie Zdrój",
  • Performing the function of the Coordinator of commissioning a new oil boiler house at EDF Polska, Wybrzeże branch of EC Gdynia,
  • Commissioning of the oil management installation at EDF Polska S.A. Kraków,
  • Commissioning of a 55MW turbine (Skoda) at TAMEH Dąbrowa Górnicza,
  • Carrying out the commissioning of facilities covered by the task called "Modernization of the Department of Carbon Derivatives Production" in the "Przyjaźń" Coking Plant in Dąbrowa Górnicza,
  • Carrying out the technological commissioning of the Coke Battery No. 5 at the "Przyjaźń" Coking Plant in Dąbrowa Górnicza,
  • Mechanical commissioning at the "Construction of the Methyl Ester Plant in Zakłady Spirytusowe "Wratislavia Bio" Sp. z o.o. in Wroclaw,
  • Provision of services during commissioning works at the "HODE / PP" Installation at the Płock Refinery,
  • Participation in assembly works in the mechanical industry and participation in commissioning works on the task "Construction of the Flue Gas Desulphurization Installation" at the Kozienice Power Plant,
  • Performing commissioning works on the task "Construction of Biodiesel Installation" at the "Trzebinia S.A." Refinery.
  • Performing a technological commissioning and maintenance of swimming poolinstallations at the indoor municipal swimming pool in Trzebinia,
  • Mechanical commissioning of devices and installations of the "Bioagra-Oil" Plant in Tychy,
  • Commissioning of the "SUPERBOS 1000" wastewater treatment unit in Częstochowa Dźbów,
  • Execution of construction and installation works and commissioning of the task "Modernization of the sewage treatment plant for the Bór-Południe estate" in Sosnowiec,
  • Comprehensive commissioning of the water cooling installation with the use of waste heat after modernization at the Hospital Waste Disposal Plant in Katowice,
  • Installation works in the mechanical and technological industry and commissioning works on the task "Comprehensive expansion and modernization of the biological part of the Ruptawa wastewater treatment plant in Jastrzębie Zdrój,
  • Carrying out of installation works of pipelines and technological devices and execution of comprehensive commissioning works on the investment task titled "Modernization of the installation of neutralization and treatment of industrial wastewater at ZGH" Bolesław "in Bukowno,
  • Modernization works on the slag and ash discharge system of the OR 35 boiler at Nadodrzańskie Zakłady Przemysłu Tłuszczowego in Brzeg.